PROJECTS

SPECIAL CASE NAME

Dismantle Changong No.31 burned Wind Turbine Generator

ENGINEERING TIME

2016.06.07~2016.06.23

ENGINEERING OUTLINE

Cut out three burned blades of WTG, and then lift up Nacelle with hub by two big cranes. Dismantle tower sections Steply by two cranes work.