PROJECTS

SPECIAL CASE NAME

High Volt transformer rigging of TPC next to Taipei-101

ENGINEERING TIME

2017.01.05~2017.01.22

ENGINEERING OUTLINE

Use Pull-up system to rise transformer up and then skidding 100m in the basement 4 floor. Lift it up to ground by strand jack combine onto hydraulic gantry L802 and rotate 90 degree for skidding out again. Loading transformer onto trailer after skid-in lifting area, and then truck back factory for maintenance.