PROJECTS

SPECIAL CASE NAME

The transport project for the 583 series train

ENGINEERING TIME

2017.11.12~2017.11.15

ENGINEERING OUTLINE

The company loaded the 583 series trains in Taipei port and then transpoted to the taipei railway workshop.