Cookies Consent

We use cookies to improve your experience. By your continued use of this site you accept such use. For more details, please see our Privacy Policy

Accept
  • Services

    Services

    • Overview
    • Wind Farm Projects
    • Heavy Transport
    • Rigging and Installation
    • Heavy Lifting
    • Logistics Management
    Learn More
  • Case Studies

    Case Studies

    • Overview
    • Heavy Transport
    • Rigging & Installation
    • Heavy Lifting
    • Wind Farm Project
    • Logistics Management
    Learn More
  • Investors

    Investors

    • Fundamentals
    • Financials
      • Monthly Revenue
      • Quarterly Results
      • Financial Reports
    • Shareholder Services
      • Stock Quotes
      • Shareholders' Meeting
      • Dividend
      • TWSE Market Observation Post System
      • Material Information
      • List of Major Shareholders
      • Prospectuses
      • Investor Conference
      • Contacts
    • Corporate Governance
      • Corporate Governance
      • Board of Directors
      • Committees
      • Internal Audit
      • Major Internal Policies
      • Practices
    Learn More
  • ESG

    ESG

    • ESG Report
    • Overview
      • Our Sustainability
      • Messages from the Chairman & President
    • Sustainable Development
      • Corporate Governance
      • Stakeholders
      • Information Security Management
      • Risk Management
      • Ethical Business Practices
    • Sustainable Environment
      • Energy Emission
      • Climate Strategy
    • Friendly Workplace
      • Employee Development
      • Occupational Health & Safety
      • Employee Welfare
      • Labor Rights
    • CSR
    Learn More
  • About Us

    About Us

    • About Us
    • Quality & Safety
    • Leadership
    • Our Stories
    Learn More
  • Press Center
  • Careers

    Careers

    • Life at Giant
    • Learning & Development
    • Join Us
    Learn More
  • Contact
    • English
    • 繁體中文
  • What are you looking for?

External Link Disclaimer

You are about to leave Giant’s website. We have provided this link as a courtesy, but it is no way an endorsement by Giant, and we are responsible for its content. Please understand that when you leave our site, our Privacy Policy is no longer in effect.

Continue Close
GIANT Case Studies Wind farm construction logistics integration: Submarine cable transportation and installation
Project timeline
May-2023 - Dec-2023
Expertise
Wind Farm Project

Wind farm construction logistics integration: Submarine cable transportation and installation

At the Zhong Neng Offshore Wind Farm, located 10 to 16 kilometers the coast of Changhua County, Taiwan, Giant has successfully completed the shore pull-in of the subsea cables. This project involves a total of 4 cables and is equipped with 31 wind turbines, each with a capacity of 9.5 MW and a maximum output power of 294.5 MW.

The main challenges of this project stemmed from the unpredictable marine conditions and weather. The cables connect offshore wind turbines to the onshore grid, navigating a route that involves varying water depths, geological conditions, and seabed dynamics. Faced with the uncertainties of natural conditions, we had to synchronize various tasks under optimal sea and weather conditions. We have provided comprehensive onshore support, including shore pull equipment, excavation, cable laying, manpower supply, and other preparatory, operational, and reinstatement.

The process of the project, we implemented stringent environmental management measures to minimize the impact on the environment, focusing on air quality and oil management. We also ensured that our machinery and equipment met emission standards and conducted regular maintenance and inspected to reduce air pollution. Additionally, we have established an oil management system to prevent spills and protect the local ecosystem. The coastal area of the project is a breeding ground for the Taiwanese Sousa chinensis, we also carried out environmental protection measures, including noise control and regular environmental assessments, to make sure the Sousa chinensis habitat not get hurt.

As global climate change and greenhouse gas emissions become increasingly serious issues, as participats in the wind energy sector not only contributes to the development of renewable energy but also highlights Taiwan's growing role as a leader in the Asian offshore wind market, leveraging its large-scale development experience. In the future, we hope to provide our professional expertise and turnkey capabilities in offshore maritime engineering.

In summary, through the Zhong Neng Offshore Wind Farm project, we have showed our expertise and technical proficiency in subsea cable installation. We look forward to continuing to leverage our strengths in the global market, advancing the development of renewable energy, and supporting the achievement of global environmental goals.

Related case studies

See all case studies
  • Yunlin OWF marshalling yard storage and transportation comprehensive transportation plan
    NOV 08, 2024
    Wind Farm Project

    Yunlin OWF marshalling yard storage and transportation comprehensive transportation plan

    read more
  • Jacket foundation and pin pile production line transportation operations of Changfang and Xidao Offshore Wind Farms
    MAY 30, 2024
    Wind Farm Project

    Jacket foundation and pin pile production line transportation operations of Changfang and Xidao Offshore Wind Farms

    read more
  • Zhong Neng 29 offshore wind power blade transportation operation
    MAY 30, 2024
    Wind Farm Project

    Zhong Neng 29 offshore wind power blade transportation operation

    read more

9F.-2, No. 21, Huanke 1st Rd., Zhubei City, Hsinchu County 302047 , Taiwan (R.O.C.)

Sitemap
  • Services
  • Case Studies
  • Investors
  • ESG
  • About Us
  • Press Center
  • Careers
  • Contact Us
Contact information
  • +886-3-559-1177
  • +886-3-559-1222
  • info@jia-yun.com.tw
Sitemap Terms of Use Privacy Policy