A process optimized for your need

Discover how we organize and dedicate ourselves to better understand your need and find you the best solutions to your challenges

  • 1

    Requirement Analysis

    Confirm the requirement of the lifting operation, including the weight, size, shape of the lifting object, as well as the location and environment of the operation.
  • 2

    Risk Assessment

    Analysis various risks that may be encountered during lifting operations, including safety, equipment damage risks, etc. Develop countermeasures to reduce it.
  • 3

    Selection of Appropriate Equipment

    according to the characteristics of the lifting object and the environment, select appropriate equipment, such as cranes and other auxiliary equipment.
  • 4

    Project Development

    develop a specific lifting plan based on lifting requirements and environmental conditions, including operating procedures, safety measures, etc.
  • 5

    Site Preparation and Execution

    ensure that the lifting work site meets safety requirements, remove obstacles, mark dangerous areas, and prepare necessary safety equipment and rescue measure, maintain good communication and coordination, and ensure that all processes run smoothly and comply with safety standards.
  • 6

    Monitoring and Adjustment

    continuously monitor the progress of lifting operations, deal with any problems without delay, and conduct regular inspections and assess the condition and performance of lifting equipment.
  • 7

    Documentation and Feedback

    record all information about the lifting operation, including data, problems and solutions during the operation, and collect feedback from relevant personnel timely to improve and optimize the lifting plan in the future.

Need Experts in Your Project?

GIANT has a reputation in the industry for making the impossible possible. We are eager to resolve your current challenges.